In the bridge project we were put into groups of four (project manager, architect, transportation chief/accountant, and carpenter). We were all given different roles, I'm an architect so I had to work with my group to find a bridge that we wanted to use as our base and then draw it to scale (1:1) on a big piece of graph paper. After that we did a second draft and scanned it, and it was emailed to me. Then me and my project manager downloaded it to the computer and opened it in adobe illustrator. We then went over the original drawing with black lines and printed it.
(The Charlotte Highway Bridge)